Gaya APA
Jonsson, P., Ivert, L, K. (2010).
The potential benefits of advanced planning and scheduling systems in sales and operations planning (Vol. 110 No. 5, 2010 pp. 659-681).
Sweden:
Emerald Insight.
Gaya MLA
Jonsson, Patrik., Ivert, Linea, Kjellsdotter.
"The potential benefits of advanced planning and scheduling systems in sales and operations planning".
Vol. 110 No. 5, 2010 pp. 659-681
Sweden:
Emerald Insight,
2010.
Article.