One of the most important operations in marine container terminals is quay crane scheduling. The quay crane scheduling problem (QCSP) involves scheduling groups of containers to be loaded and unloaded by each quay crane. It also requires addressing practical issues such as minimum spacing between quay cranes and precedence relationships between container groups. This study addresses the QCSP wi…