PELINDO LIBRARY & KNOWLEDGE CENTER

PT Pendidikan Maritim dan Logistik Indonesia

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
Image of Third-party logistics in construction: the case of a large hospital project
Penanda Bagikan

Article

Third-party logistics in construction: the case of a large hospital project

Andreas Ekeskär - Nama Orang; Martin Rudberg - Nama Orang;

The construction supply chain is of temporary nature and complex, with many interactions between multiple actors in different construction projects. This challenging context typically leads to relatively higher costs and lower productivity, compared to other industries. Supply chain management (SCM) has been put forward as a mean to better handle this challenging context. As a part of SCM initiatives some construction industry stakeholders have turned to third-party logistics (TPL) providers, especially in large construction projects. The use of TPL providers is a new, and under-investigated, phenomenon in the construction industry. The main purpose of this study is thus to explore the use of a TPL provider in a large construction project and to analyse its resulting effects. Driving forces and possible concerns for implementing TPL are identified and the possibility for TPL to be a facilitator for implementing SCM in construction is investigated. The research is based on a literature review and an explorative case study of a large hospital project in Sweden, where the client and the main contractor have initiated the use of a TPL provider to coordinate sourcing and materials handling activities on site. The results show positive effects on establishing an effective interface between the construction site and the supply chain. The results also show that a TPL solution facilitates an increase in productive work at the construction site itself, a reduction of costs and an increased utilisation of site assets. On the downside, the study also shows a lack of SCM knowledge amongst the involved actors in the project, hindering them to reap the full potential of TPL.


Ketersediaan
#
IPC Corporate University Library ATC LO RUD t C.1
ATC16008965
Tersedia
Informasi Detail
Judul Seri
Construction Management and Economics
No. Panggil
ATC LO RUD t
Penerbit
Sweden : Routledge., 2016
Deskripsi Fisik
19 p.
Bahasa
English
ISBN/ISSN
-
Klasifikasi
LO
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
online resource
Edisi
Vol. 34, No. 3, 174–191
Subjek
Supply Chain Management
Case study
construction logistics
construction supply chain
Info Detail Spesifik
-
Pernyataan Tanggungjawab
Martin Rudberg
Versi lain/terkait
JudulEdisiBahasa
Concurrent engineering: a multi-disciplinary approach for constructionVolume 11 · Number 5 · 1998 · 295–300en
Logistics case study based research: towards higher qualityVol. 42 No. 3, 2012en
Lampiran Berkas
  • Harap masuk untuk melihat lampiran
Komentar

Anda harus masuk sebelum memberikan komentar

PELINDO LIBRARY & KNOWLEDGE CENTER
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

PT Pendidikan Maritim dan Logistik Indonesia (PMLI) berdiri pada 10 Juli 2013, berdasarkan Akta Pendirian No. 26 Tanggal 10 Juli 2013 dan Akta Kementerian Hukum dan Hak Asasi Manusia No. AHU-45955.AH.01.01 tahun 2013.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

© 2025 PT Pendidikan Maritim dan Logistik Indonesia

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?