PELINDO LIBRARY & KNOWLEDGE CENTER

PT Pendidikan Maritim dan Logistik Indonesia

  • Beranda
  • Informasi
  • Berita
  • Bantuan
  • Pustakawan
  • Area Anggota
  • Pilih Bahasa :
    Bahasa Arab Bahasa Bengal Bahasa Brazil Portugis Bahasa Inggris Bahasa Spanyol Bahasa Jerman Bahasa Indonesia Bahasa Jepang Bahasa Melayu Bahasa Persia Bahasa Rusia Bahasa Thailand Bahasa Turki Bahasa Urdu

Pencarian berdasarkan :

SEMUA Pengarang Subjek ISBN/ISSN Pencarian Spesifik

Pencarian terakhir:

{{tmpObj[k].text}}
Image of Reconstructing the history of the main volvo tuve plant: some general trends, reasons And consequences for different assembly system designs
Penanda Bagikan

Article

Reconstructing the history of the main volvo tuve plant: some general trends, reasons And consequences for different assembly system designs

Tomas Engström - Nama Orang; Bo Blomquist - Nama Orang; Ove Holmstrom - Nama Orang;

This paper reports on the history of the main Volvo Tuve truck plant in Gothenburg from its beginnings in 1981 until 2002. It focuses on the assembly work involved in the completion of truck chassis carried out by blue-collar employees. Extensive (physical) alterations during this period have been important for understanding the plants’ present design. The various designs of the assembly system, in combination with alterations and changes, have radically reformed the blue-collar employee’s work in a way that, in most respects, had not been intended. The ambitious guidelines, design assumptions and praxis of the early plant design which promoted collective dimensions of work have shifted to ones in which assembly work can be seen more as a set of individualised tasks. Moreover, the plant, which in earlier times had been small-scale and utilised a heterogeneous assembly systems design, now has been transformed into a large-scale plant with a homogenous assembly systems design. That is, to be more specific, two rather short assembly lines with intermediate buffers (1980s assembly systems design) were turned into the use of extended assembly lines without intermediate buffers (1990s assembly systems designs). The latter assembly systems were earlier working in coexistence with so-called assembly docks (small work groups completed their own truck chassis). Lastly, these heterogeneous assembly systems designs were recently changed by further extension of the two main product flows and the assembly docks were closed down (2000s assembly system design). We argue that the choice of assembly systems designs was, and maybe still is, an ad hoc process and not a truly rational process. The history of the Volvo Tuve plant history illuminates how one specific plant can illustrate an uneven line of development with regard to assembly system design, within an organisation which successively has turned more international by an ongoing process of creating one single, larger scale, assembly system design. Thereby leaving behind the characteristics which were once a trademark of the Swedish automotive industry.


Ketersediaan
#
IPC Corporate University Library ATC LO HOL r C.1
ATC1602358
Tersedia
Informasi Detail
Judul Seri
International Journal of Operations & Production Management
No. Panggil
ATC LO HOL r
Penerbit
Sweden : Emerald Insight., 2004
Deskripsi Fisik
22 p.
Bahasa
English
ISBN/ISSN
-
Klasifikasi
LO
Tipe Isi
-
Tipe Media
-
Tipe Pembawa
online resource
Edisi
Vol. 24 No. 8, 2004 pp. 820-839
Subjek
Automotive industry
Sweden
Work design
Team working
Assembly
Info Detail Spesifik
-
Pernyataan Tanggungjawab
Ove Holmstrom
Versi lain/terkait
JudulEdisiBahasa
Distribution network design: a literature review and a research agendaVol. 45 No. 5, 2015en
Supplier risk assessment and monitoring for the automotive industryVol. 38 No. 2, 2008en
Operations and logistics issues in modular assembly processes: cases from the automotive sectorVol. 17 No. 2, 2006 pp. 168-186en
Lampiran Berkas
  • Harap masuk untuk melihat lampiran
Komentar

Anda harus masuk sebelum memberikan komentar

PELINDO LIBRARY & KNOWLEDGE CENTER
  • Informasi
  • Layanan
  • Pustakawan
  • Area Anggota

Tentang Kami

PT Pendidikan Maritim dan Logistik Indonesia (PMLI) berdiri pada 10 Juli 2013, berdasarkan Akta Pendirian No. 26 Tanggal 10 Juli 2013 dan Akta Kementerian Hukum dan Hak Asasi Manusia No. AHU-45955.AH.01.01 tahun 2013.

Cari

masukkan satu atau lebih kata kunci dari judul, pengarang, atau subjek

© 2025 PT Pendidikan Maritim dan Logistik Indonesia

Ditenagai oleh SLiMS
Pilih subjek yang menarik bagi Anda
  • Karya Umum
  • Filsafat
  • Agama
  • Ilmu-ilmu Sosial
  • Bahasa
  • Ilmu-ilmu Murni
  • Ilmu-ilmu Terapan
  • Kesenian, Hiburan, dan Olahraga
  • Kesusastraan
  • Geografi dan Sejarah
Icons made by Freepik from www.flaticon.com
Pencarian Spesifik
Kemana ingin Anda bagikan?