The Volvo Uddevalla plant and interpretations of industrial design processes
Argues that the design of the Volvo Uddevalla plant may be described as a process with an “internal logic” in which design options were eliminated through irreversible design decisions until only one alternative remained ‐ an unorthodox alternative comprising, for example, long cycle time work never used before for full‐scale production of automobiles. Contends that the most innovative features of the Uddevalla plant ‐ i.e. the detailed layout in the assembly workshops and the corresponding unorthodox production principles used ‐ were in many respects an unanticipated outcome of the design process. Pre‐existing gross layout of the plant as well as the interaction between the materials feeding techniques adopted and the operation of the automated guided vehicle system. When this was perceived by the Volvo managers, the design process had passed the point of no return, i.e. the investments made and lack of time prevented regression to more traditional layouts and production principles.
Judul | Edisi | Bahasa |
---|---|---|
Design and evaluation of a simulation game to introduce a multi-Agent system for barge handling in a seaport | en | |
Balanced system for knowledge process management in SMEs | Vol. 22 No. 1/2, 2009 pp. 36-50 | en |