Article
Evaluation of dry port implementation in Ghana
Abstract
Purpose – Congestion at Ghana’s main seaports is a problem that has received much attention recently. This is as a result of continuous increase in containerized cargo. To increase the capacity of Ghana’ seaport, the Ministry of Transport through the Ghana Shippers Council initiated the Boankra Inland Port Project. The aim of this paper is to assess the feasibility and economic effects of implementing the Boankra Inland Port as a solution to reduce congestion at the main seaports, as well as reduce transportation cost. Design/methodology/approach – The location of the inland port was assessed using the gravitational model. Data for the gravitational model are distances from the main seaports in Ghana and Boankra Inland Port to major hinterland destinations and population of the destinations. Also, 210 respondents were selected and interviewed on contribution of the dry port concept to the economy and transportation management in
Ghana.