The purpose of this paper is to look into the fate of a troubled initiative in Hong Kong that was developed in the midst of discussions between Beijing and London leading towards the 1997 handover. It sets out to shred new light on the “forecasting gap”: the gap between the anticipated level of traffic and the real volume of traffic in the years following the opening of a new infrastructure